|
Warehouse and Industrial complex in Martusovka village
Martusovka village, Е-40/М-03 Highway, Borispol Direction
Warehouse and Industrial complex is a part of mixed-use project with the total size over 2.5 mln sqm. Complex is located near Kiev-Borispol highway, neighbouring Borispol airport and has good transport interchange, well-developed infrastructure and convenient traffic flow on its territory.

A-class warehouse complex
Total area: over 500,000 sqm
First three phases are under construction with delivery schedule as follows:
1st phase – total area approx 50,490 sqm (August 2008)
2nd phase – total area approx 48,768 sqm (December 2008)
3rd phase – total area approx 58,695 sqm (March 2009)
Technical specifications are different for each phase
Unique advantages of the complex:
built-to-suit design according to customer’s specific requirements
expansion within single warehouse complex for the next 2-3 years
common border with Borispol International Airport gives a possibility to use all benefits of cargo customs terminal without exiting the site
Kievmetalloprom Warehouse Complex 7, Industrialnaya St., Kalinovka village, Е-40/М-05 Highway, Odessa direction
Warehouse complex is located within the borders of Kalinovka village (Е-40/М-06 Highway) along Zhytomir highway, at the distance of 32 km from Kiev city border. Distance from the Ring Road – 39 km. Complex has direct access onto Е-40/М-06 Highway (façade). The only complex on Zhytomir Highway with fully-fledged roundabout (cloverleaf) next to it.

MLP Chaika Warehouse Complex, Chaiki village, Е-40/М-06 Highway, Zhytomir direction
The complex is located near the city border in the immediate proximity to E-40/M-06 highway and will have a well-developed infrastructure. Good access for visitors. 24-hour security system of the territory and video surveillance. Lease agreements totaling 48,000 sqm have been signed with MTI and Fordon Logistic.

- A-class warehouse complex
- Total area: 98,000 sqm, 3 phases
- Clear storage height: 12 m
- Parking: 1 parking lot for truck and 2 parking lots for cars per 1,000 sqm ofleasedwarehouse premises
- Completion date: Q1–Q3 2008, phase-by-phase commissioning, 3 phases in total
Komodor Logistics Park Kalinovka village, Е-40 / М-06Highway, Zhytomir direction
The complex is located in Kalinovka village with a well-developed infrastructure. 24-hour security system of the territory and video surveillance. The Project is developed be Quadrum part of Cube Capital Ltd London. Colliers International is an exclusive leasing agent for this complex

- А-class warehouse complex
- Total area: 69,000 sqm
- Clear storage height: 12 m
- Parking: ample car and truck parking for 60 trucks and 120 cars
- Completion date: Q4 2008
West Gate Logistic Warehouse Complex Stoyanka village, Е-40/М-06 Highway, Zhytomir Direction
The complex is located in the proximity to all major right-bank highways and has a well-developed infrastructure. 24-hour security system of the territory. Project is carried-out by a professional Austrian developer with a proven track-record in Central and Eastern Europe.

- A-class warehouse complex
- Total area: 80,000 sqm
- Clear storage height: 12 m
- Parking: 1 truck and 2 car parking lots per 1,000 sqm of warehouse space
- Completion date: Q3-Q4 2008
Biocon Pharmaceutical Logistics Complex Velyka Oleksandrivka village, P-28 road, Boryspil District
The complex is located near all main left-bank highways and has well-developed infrastructure. The complex is designated for pharmaceutical products storage. Additional custom clearance and outsourcing services can also be provided in the warehouse by the Landlord.

- A-class warehouse complex for pharmaceutical products storage
- Total area: around 30,000 sqm
- Clear storage height: 9 m
- Parking: 10 parking lots for trucks and 38 parking lots for cars
- Completion date:
- 1st phase (10,000 sqm): Q2 2008
- 2nd phase (10,000 sqm): Q4 2008 –
Q1 2009
- 3rd phase (10,000 sqm): Q 4 2008 –
Q1 2009
Odessa Logistic Park Dachne village, E-95/M-05 Highway.
The complex has direct access (façade) to M-05/E-95 Kyiv–Odessa highway and has a well-developed infrastructure. Project is carried-out by a professional Austrian developer with a proven track-record in Central and Eastern Europe.

- A-class warehouse complex
- Total area: 160,000 sqm,
- first stage: around 47,000 sqm
- Clear storage height: 12 m
- Parking: to be confirmed by the Landlord
- Completion date: Q II-III 2008 for the first stage
back to top
|